In 2019 Ashville worked with Southern Grove and Mcaleer & Rushe on the demolition and site clearance of the former college.

Ashville were responsible for both the removal of waste and the supply of material, as part of both Demolition and Grounds Work packages.

Ashville removed 30,000 tonnes of inert muck over 4-week period, with up to 100 loads being trucked out per day. Contaminated soil was taken to a specialist facility by Ashville for licensed treatment.

Ashville then supplied and delivered 5,000 tonnes of recycled material for pilling mat over a 1-week period as part of the enabling of the site.

Ashville Demolition
Grab Hire London

We are Dedicated to

Ensuring that everything we do is ethical, sustainable & safe. We care highly about our team, our clients & the future of our planet, therefore we ensure that we do everything in our power to perfect everything we do in our processes.

Employee Equality

EQUALITY

We ensure that we create an environment where everyone is welcomed & every individual feel safe & a valued team member.

Aggregates Sustainability

SUSTAINABILITY

We ensure that help to build a world that will improve the lives of future generations and use eco-friendly methods. 

Ashville Health and Safety

SAFETY

Risk assessments and safety precautions are vital in keeping construction workers out of harm’s way.

AREAS WE COVER